Skip Navigation

Number of Permits by Office


This data is current as of: Friday, January 31, 2025

Select a Permit Type to View Specific Information
Permit Type Total Under Review
Air - Construction Permit 6
Air - Federally Enforceable State Operating Permit (FESOP) 1
Air - Operation Permit 3
Air - Title V Operation Permit 15
Domestic Wastewater Biosolids 4
Waste - Solid Waste Closure Permit 4
Waste - Solid Waste Construction Permit 1
Waste - Solid Waste Operation Permit 5
Waste - Waste Tire Permit 1
Water - Domestic Wastewater Collection/Transmission System 4
Water - Domestic Wastewater Type I Facility Permit 2
Water - Domestic Wastewater Type I Residuals/Septage Management Facility Permit 1
Water - Domestic Wastewater Type I Wastewater Treatment Plant Permit 19
Water - Domestic Wastewater Type II Facility Permit 1
Water - Domestic Wastewater Type II Wastewater Treatment Plant Permit 5
Water - Domestic Wastewater Type III (less than 10,000 gpd) Wastewater Treatment Plant Permit 5
Water - Domestic Wastewater Type III Residuals/Septage Management Facility Permit 1
Water - Domestic Wastewater Type III Satellite Treatment System Permit 1
Water - Domestic Wastewater Type III Wastewater Treatment Plant Permit 11
Water - Drinking Water Distribution System General Permit 2
Water - ERP Exemption Permit 62
Water - ERP Formal Determination 1
Water - ERP Modifications 4
Water - ERP Noticed General Permit 16
Water - Individual With No Conceptual Approval Permit 116
Water - Industrial Wastewater Concrete Batch Plant Permit 2
Water - Industrial Wastewater Group 1, Surface Water Discharge Permit 2
Water - Industrial Wastewater Group 4A, Feedlots W/> Than Number Of Listed Animals Permit 4
Water - Industrial Wastewater Group 5B, Design Daily Discharge >100,000 to 500,000 GPD Permit 1
Water - Industrial Wastewater Group 5C, Design Daily Discharge >10,000 to 100,000 GPD Permit 1
Water - Industrial Wastewater Group 5d, Design Daily Discharge 10,000 or Less GPD Permit 1
Water - Industrial Wastewater Group 7A, Design Daily Flow >500,000 GPD Permit 1
Water - Industrial Wastewater Group 7D, Design Daily Flow 50,000 or Less GPD Permit 1
Water - Industrial Wastewater Petroleum Cleanup Site Permit 1
Water - State 404 General Permit 110
Water - State 404 Individual Permit 180
Water - State 404 No Permit Required 54
Water - State 404 Permit Modification 10